Geo Technical Investigation
Geo technical investigation
- Geotechnical investigations typically involve a combination of fieldwork and laboratory testing. Fieldwork may include drilling boreholes by Mannual auger or rotary drilling, conducting Standard penetration tests (SPT), excavating test pits, and collecting samples for laboratory analysis. Laboratory testing involves analyzing soil and rock samples to determine their physical and mechanical properties.
- Apart from Soil investigation, our team is well qualified to undertake other Field Geotechnical Testing such as Field Density Test by Core Cutter and Sand Replacement Boring, Standard Penetration test, Field Density Test by Core Cutter and Sand Replacement, Field CBR, Plate Load Test, Electrical Resistivity Test etc.
- Geo technical investigation is caaried to asses Site Characterization, Geological Mapping,Groundwater Assessment, Risk Assessment,Foundation Design.
Project Executed
Kalpataru Power Transmission Ltd
- Soil investigation for 400KV Quad Line from Narendra (new) to kushatagi tender in koppal district
- Soil investigation for 400KV Quad Line from Narendra (new) to Gadag for TBC tender Purpose
- Soil investigation for 400KV Quad Line from YTPS to Kalaburagi KPTCL SS & TL Package
Rajkamal Builders Pvt.Ltd.Engineers & Contractors
- Four Laning of Hassan to Maranahally Section of NH-75
(Ch.184+912 to ch.230+060) under NHDP Ohase IV on EPC Mode
and Proposed Construction of Minor Bridge is located at CH.
226+600 for Hemavathi River at Sakleshpura
SUEZ Projects Pvt. Ltd.
- Soil investigation work for Implimentation of 24X7 water supply system in city of coimbatore.
- Soil investigation work for Implimentation of 24X7 Water Supply System Project at Davanagere.
- Geo-Technical Investigation Works at Mangalore 24X7 Water System Project
- Geo-Technical Investigation for proposed construction of Distribution network – Operator Assested in Davangere including O & K of 24X7 Davangere Water Supply System
Shankaranarayana Constructions Private Limited
- Construction of Elevated structures(viaduct & stations) of length 9.774km from Chainage 9859.000m to 18236.000m and 7 mo’s of elevated metro stations viz, Kodibeesanahalli, Marathahalli, ISRO, Doddanekundi, DRDO Sports complex, Saraswathi Nagar and KR Puram including 1.097 km length link line to Baiyappanahalli Depot, 0.30 km length Pocket track, Road widening, Ultility diversion and allied works of Bengaluru Metro Rail Project Phase-2A.
- Construction of Elevated structures(viaduct & stations) of length,9.774km from Chainage 9859.000m to 18236.000m and 7 mo’s of
elevated metro stations viz, Kodibeesanahalli, Marathahalli, ISRO, Doddanekundi, DRDO Sports complex, Saraswathi Nagar and KR Puram including 1.097 km length link line to Baiyappanahalli Depot, 0.30 km length Pocket track, Road widening, Ultility diversion and allied works of Bengaluru Metro Rail Project Phase – 2A
L&T Construction
- Design & Construction of Sewage Treatment Plant – CP100017,
Job :LE180083 – BDA NPKL PACKAGE 1 - Design & Construction of Sewage Treatment Plant – CP100017,
Job :LE180083 – BDA NPKL PACKAGE 1
ITD-CEM-INDIA-JV
- Construction of Elevated Structures (Viaduct & stations) of 7.218km (Approx). Length from visvesvaraya industrial area station (excl) to whitefield station (incl).(chainage 26643.032m to 33861.465m) including viaduct line entry to whitefield depot,road widening & allied works and 7 numbers of elevated metro stations viz, kundanahalli,vydehi hospital,sri satyasai hospital,ITPL,Kadugodi,ujwal vidyalaya and whitefield in the extension of east side of E-W corridor of Bangalore Metro Rail Project, Phase-2
- Construction of Elevated Structures (Viaduct & stations) of 7.218km (Approx). Length from visvesvaraya industrial area station (excl) to whitefield station (incl).(chainage 26643.032m to 33861.465m) including viaduct line entry to whitefield depot,road widening & allied works and 7 numbers of elevated metro stations viz, kundanahalli,vydehi hospital,sri satyasai hospital, ITPL,Kadugodi,ujwal vidyalaya and whitefield in the extension of
east side of E-W corridor of Bangalore Metro Rail Project, Phase-2
Sobha Limited
- Construction of Panathur property
POWER MECH PROJECTS LIMITED
- Construction of Challaghatta Depot-BMRCL