Non Destructive Tests

Non Destructive Test

  • Non-Destructive Testing (NDT) is a cornerstone of modern civil engineering practice. Unlike traditional testing methods that require the destruction of samples, NDT allows for the evaluation of materials, components, and structures without causing damage. By utilizing advanced technologies such as ultrasonic testing, Rebound hammer, Pile Integrity, Dye Penetration test,Carbonation test, Cover meter depth and Half cell Potential, our experienced team of engineers can detect defects, flaws, and vulnerabilities with unparalleled precision and accuracy.
  • we recognize the critical importance of maintaining the integrity and safety of civil engineering structures. That’s why we employ cutting-edge Non-Destructive Testing (NDT) techniques to ensure the quality, reliability, and longevity of infrastructure projects.

Project Executed

Larsen & Toubro Limited (K-RIDE)

Bengaluru Suburban Railway Project (BSRP)

Shankaranarayana Constructions Private Limited

Construction of Elevated structures (Viaduct & Stations)of length 9.774 km from Chainage 9859.000 m to 18236.000 m and 7 Nos of elevated metro stations viz, Kodibeesanahalli, Marathahalli, ISRO, Doddanekundi, DRDO Sports complex, Saraswathi Nagar and KR Puram including 1.097 km length link line to Baiyappanahalli Depot, 0.30 km length Pocket track, Road widening, Utility diversion and allied works of Bengaluru Metro Rail Project Phase -2A.

G R Infraprojects Limited

BMRCL/Phase-2/Reach-6/Elevated/Via&Stn (R6-CC-01BW)

M/s. NCC Limited

Construction of elevated structure(viaduct & Stations) for a length of 15.011km from Chainage 21500.00 to Chainage 36511.00 and 2 No.of elevated stations viz. Bettahalasuru & Doddajala, including road widening, Utility diversion and other allied works of Bengaluru Metro Rail Project, Phase-2B. This lenght includes approx. 718.18m length of cut & cover portion in front of yelahanka Air Force Station.

M/s. HCC URCC JV

Construction of Elevated Structures (Metro viaduct, stations and road cum rail Flyover Bridge) of length 6.340km(approx) from HSR Layout (excluding) to RV Road widening & allied works & till dead end (Chainage:5788.52m – 551.00mm), (including) Road widening & allied works & 5 No’s of Metro Stations viz,Central silk board, BTM layout,Jayadeva Hospital, Ragigudda & RV Road in Reach-5 line of BMRCL – Phase-2.

M/s. BSR Infratech India Ltd.

Construction of Metro Rail Depot Structures, Site development works, internal roads & drainage works in Depot area at Anjanapura in Reach-4B line of Bangalore Metro Rail Project, Phase-2

Suez India Private Ltd

Secondary Clarifier-A, of Capacity 30MLD, Sewage treatment plant, K&C Valley, Bangalore.

ISGEC Heavy Engineering Limited

Construction of Metro Rail Depot Structures, Site Development works, Internal roads & drainage works in Depot area at Kothnur in Reach -06 of Bangalore Metro Rail Project, Phase – 2.

WhatsApp-Image-2024-05-27-at-9.50.01-AM-2.jpeg
WhatsApp-Image-2024-05-27-at-9.49.59-AM-1.jpeg
WhatsApp-Image-2024-05-27-at-9.50.00-AM-1.jpeg
WhatsApp-Image-2024-05-27-at-9.50.01-AM-1.jpeg
WhatsApp-Image-2024-05-27-at-9.50.00-AM.jpeg
WhatsApp-Image-2024-05-27-at-9.50.02-AM.jpeg
WhatsApp-Image-2024-05-27-at-9.50.01-AM.jpeg
WhatsApp-Image-2024-05-27-at-9.49.59-AM.jpeg
unnamed-63.jpg
Load More

End of Content.

Scroll to Top
× How can I help you?